Skip to main content
Virtual Chemistry

Premixed & counterflow flames (EM2C-V-H2)

Hydrogen-air virtual scheme for premixed and counterflow flame configurations.

Version
1.0.0
Status
published
License
CC-BY-4.0
Updated
2026-03-02
Objective
Premixed and counterflow flames (EM2C-V-H2)
Formats
Cantera, CHEMKIN
Tags
hydrogen, air
Authors
Matthieu Preteseille
Quick download:CanteraCHEMKIN

Detailed mechanism

This scheme was reduced from Y. Zhu et al., Combustion and Flame (2024).

Cite the reference mechanism

Credit the original detailed mechanism this scheme derives from.

@article{zhu2024h2,
  author  = {Zhu, Yuxiang and Curran, Henry J. and Girhe, Sanket and Murakami, Yuki and Pitsch, Heinz and Senecal, Kelly and Yang, Lijun and Zhou, Chong-Wen},
  title   = {The combustion chemistry of ammonia and ammonia/hydrogen mixtures: A comprehensive chemical kinetic modeling study},
  journal = {Combustion and Flame},
  year    = {2024},
  volume  = {260},
  pages   = {113239}
}

Mechanism structure

$$ \begin{aligned} \mathrm{H_2} + \frac{1}{2}\mathrm{O_2} &\rightarrow \alpha''_{1,I} I + \alpha''_{1,P_1} P_1 + \alpha''_{1,H_2O}\mathrm{H_2O} \\ I + \alpha'_{2,P_1} P_1 &\rightarrow \alpha''_{2,H_2O}\mathrm{H_2O} \\ \mathrm{H_2} + \alpha'_{3,P_1} P_1 &\rightleftharpoons \alpha''_{3,H_2O}\mathrm{H_2O} \\ \mathrm{O_2} + \alpha'_{4,H_2O}\mathrm{H_2O} &\rightleftharpoons \alpha''_{4,P_1} P_1 \end{aligned} $$

Conditions / training domain

Scheme overview
ParameterSpecification
Detailed schemeY. Zhu et al.
Fuel$H_2$
OxidizerAir
Virtual species
Virtual product$P_1$
Intermediate species$I_1$
Elements$\text{H, O, N}$
Species$\text{H}_2, \text{O}_2 , \text{N}_2, \text{H}_2\text{O}, \text{P}_1, \text{I}_1$
Thermodynamic modelIdeal gas
Transport modelMixture-averaged
Available formatsCantera, CHEMKIN

Training databases

Burnt gases thermochemical states training database
ParameterSpecification
ConfigurationBurnt gases equilibrium states
Operating conditions
Equivalence ratio$ 0.4 \leq \phi \leq 4$
Enthalpy defect$\Delta h \in [0\%, 10\%, 20\%, 30\%]$
Fresh-gas temperature$T_u = 300\,K$
Pressure$P = 1\,atm$
Fitness functionMixture heat capacity, enthalpy, entropy, Gibbs energy, and real species
Data generation codeCantera
Reference mechanismY. Zhu et al.
Premixed flame training database
ParameterSpecification
Configuration1D freely-propagating premixed flames
Operating conditions
Equivalence ratio$ 0.4 \leq \phi \leq 4$
Fresh-gas temperature$T_u = 300\,K$
Pressure$P = 1\,atm$
Fitness functionTemperature, heat release rate, thermal conductivity
Data generation codeCantera
Reference mechanismY. Zhu et al.
Transport modelMulticomponent with Soret effect

Comparison with detailed scheme

Comparison with detailed scheme

CFD application: 2-D Bunsen burner

CFD application: HYLON Burner

Known limitations & domain of validity

  • Validated for premixed flames for fresh gases injection of equivalence ratio φ = 0.4–4.0 at P = 1 atm, T_u = 300 K; extrapolation outside this range is not recommended.
  • Optimized on laminar premixed flames, validated a posteriori on laminar counterflow diffusion flames and multi-regime non-adiabatic turbulent flames.
  • No NOx chemistry; not suitable for pollutant prediction.

Downloads

Scheme for:
Cantera
em2c_v_h2_cantera.zip
2.8 KB
CHEMKIN
em2c_v_h2_chemkin.zip
5.2 KB
Official citable archive

The full, versioned dataset for this scheme is published on Recherche Data Gouv — cite this when you use the scheme.

TBD — pending dataset publication

Citation & license

Cite this scheme

Use this when referencing the reduced scheme / dataset you downloaded here.

DOI: TBD — pending dataset publication

@data{vc_em2c_v_h2_2026,
  author    = {Virtual Chemistry Lab},
  title     = {EM2C-V-H2 reduced virtual scheme},
  publisher = {Recherche Data Gouv},
  year      = {2026},
  note      = {TBD — add DOI on publication}
}

Released under CC-BY-4.0.

Notes

This page gathers the mechanism structure, downloads, figures, and references for the EM2C-V-H2 virtual scheme. Use the validation data and solver settings provided with the scheme archive when setting up new calculations.